2024 Projects
In 2024, Friends supported two capital projects at the stadium. A berm expansion project down the left-field line increased capacity from 100-150 fans to 200-250 fans and included a brand-new, 150-foot concrete path on the backside will allow fans easy access to this favorite viewing spot. Teichert Construction, who originally built the berm before the inaugural 2017 Lincoln Potters season, returned to undertake this project. The second project was the installation of 10-foot high netting installed from the visitor’s dugout to the back of the field. This netting helps protect people on the berm from line drive hits down the third base line. This project was also made possible by advance funding from the City of Lincoln and long-term funding by the Lincoln Potters Baseball Club.